White Glove Project

Precision White Glove Project for Commercial Office Block

Orbis International successfully completed another high-end white glove project, showcasing their extensive industry experience and commitment to precision and safety. This time, the project involved the delivery and installation of large glass panels in a 4th-floor commercial office space.

The project required a well-coordinated team, specialised equipment, and meticulous planning to ensure a smooth and on-time delivery.

If you have a specialist project, Orbis International has a dedicated team ready to assist. Contact us at projects@orbis-int.com.

The Challenge

The project required the careful removal of a window on the 4th floor to allow access for the glass panels. This task necessitated coordination with building management and local authorities for a road permit closure to ensure safe transportation and installation.

Scope of Work:

  • Delivery and installation of large glass panels

  • Lifting beams and spreader feeder setup

  • Truck-mounted crane with 70-meter reach

  • Team of 4 skilled professionals, including a glass installation fitter

The Solution

Orbis' solutions for this project were comprehensive and expertly executed. The team coordinated closely with local authorities to secure a road permit closure and ensured the precise removal of the 4th-floor window for access. Specialized equipment, including a 70-meter truck-mounted crane, lifting beams, and a spreader feeder, was used to safely position the glass panels. The crane's reach and the team’s expertise ensured an accurate, controlled lift, while the glass installation fitter meticulously positioned and secured the panels. Throughout the project, safety protocols were strictly followed, and the team’s experience allowed for smooth, efficient work that ensured on-time delivery and minimal disruption. The combination of expert planning, cutting-edge equipment, and skilled professionals resulted in a flawless installation.

The Outcome

Thanks to meticulous planning and execution, Orbis International successfully completed the delivery and installation of the glass panels on time, without incident, and with minimal disruption to the building’s operations. The white glove approach provided the client with peace of mind knowing that every detail was handled by seasoned professionals.